SAVED: PAGE: ACTIVE AREA:

Low Nox Cochran Boiler Replacement

Date Published: 25/03/2021

Mitsubishi UK Ltd (formlery Lucite International) engaged with Cochran replace their existing Wee Chieftain boiler, which had served them well for over three decades, with the latest ST28 unit to deliver reliable, highly efficient future proofed performance for the next 30 years. The proven longevity and reliability of the old boiler plant is testament to Cochran boiler know how and was a significant factor in selecting an ST28 unit as its replacement.


Cochran ST28 Boiler


The Results That Matter

The benchmark Nox emissions figures achieved onsite have now been verified by an independent body. During a rigorous 120 minute test period, which saw the burner firing continuously, achieved exceptional emission levels of just 44.9 mg/Nm3 (+/- 3.3 mg/Nm3).

This ‘real world’ application amply demonstrates that Cochran’s ST28 design, sub-50 mg/Nm3 NOx levels can be reliably achieved, even at full firing. 


For details on the full Case Study, please see attached.  





< Article List

Share this:

Total Pages:
Total Results:
Page Start:
Page Result #:

Address: Newbie Works, Annan, Dumfries & Galloway DG12 5QU Scotland. Email: info@cochran.co.uk. Tel: +44 (0)1461 202111.

©2014 Cochran. Site by Big Red Log in

X

Contact Us

Check User:

This form collects and sends the information supplied to . You can read our privacy policy for full details on how we protect and manage your data.

I consent to having collect the above details.